jianke1979 2013-3-11 21:46
我的本期第1次下注:
6/16/30-15×3
jianke1979 2013-3-11 21:47
我的本期第2次下注:
19/26/33-09×3
jianke1979 2013-3-11 21:48
我的本期第3次下注:
18/23/32-13×3
jianke1979 2013-3-11 21:48
我的本期第4次下注:
27/28/29-16×3
jianke1979 2013-3-11 21:50
我的本期第5次下注:
08/13/22-03×3
qduvdywvu 2013-3-11 22:19
Beijing Metro Line 10 to achie
?Morning, before the start of the Subway Line 10, two through the ceremony, workers using a mobile phone camera. (Reporter Chen Si) photo / Correspondent Lin Hui WASHINGTON, known as the city, "Metro Second Ring" on the 10th line, this morning, "C"-shaped hole through. In addition to the Fengtai station to Niwa station two stops, three interval, the two lines of the line 10 has all the holes to pass, and one of the operations on the 10th line of the "C" shaped. Morning, "C" shape through to the morning, with the West Diaoyutai to Tsz Ting Temple interval smooth hole of the shield machine, construction Fangzhong Railway Tunnel Group introduced the segment interval smooth main road through the West Third Ring Road, Pratt & Whitney Bridge, Balizhuang bridge from below the line Gongzhufen station on the 1st through the large span of tight construction beneath existing subway and the subway for the first time does not slow. The segment interval through the marks on the 10th of the entire line has been formed "C" shaped. On the 10th line of two western section, which is reentrant line of the West Bureau Station to two terminal and two southern section, that is, the two starting point Jinsong Station South reentrant line to fanjia Village Station common operations on the 10th line a formation of a "C" shaped continuous lines. Operation by the end contention O Paul C reporter learned from the Beijing Railway Construction and Management Co., Ltd., Metro Line 10 across the board after the opening will be formed outside of the Metro Line 2 subway loop. Fengtai station to Niwa station two stops range "in order to meet the Fengtai railway station converted construction, no holes through. The end of this year, the opening of the line 10 will compete O Paul C ", that is, may be temporarily in the Fengtai station segment reentry form" C "word operations, but the formation of the Ring through operations and strive with a project. ● engineering difficulty through the various railways rivers and lakes on the 10th line of two across the railway line in the ground 3, 7, crossing rivers and lakes across the board through the bridge 15 are currently in a smooth crossing.
b408711025 2013-3-11 23:55
我本期第一次下注;
09/19/25-08x3
b408711025 2013-3-11 23:55
我本期第二次下注
11/23/30-05x2
b408711025 2013-3-11 23:59
我本期第三次下注
07/14/28-13x3
336699qwas 2013-3-12 02:05
11
10/12/17-7x1000000000
sky710521 2013-3-12 08:32
本期第一次下注:
3/16/23/-6×3
dyzhouwei 2013-3-12 09:13
本期第一次下注:
5/13/26-7x3
tianya666 2013-3-12 09:20
我本期第一次下注
6/27/33-9x3